St. Augustine Beach Demolition Permits: Email Submittals, Franchise Haulers, and Tree Rules

Short answer: the City of St. Augustine Beach permits demolition through its own Building Department at City Hall, 2200 A1A South. The demolition application must be notarized by both the owner and the contractor, and submittals are made by email as separately labeled PDFs, not by uploading to the City’s permit portal. The City also requires any business privately collecting construction and demolition debris inside City limits to operate under a City franchise agreement, so the choice of hauler matters, and trees on the lot have their own permit with a pre-issuance inspection.

Black straight-wall roll-off dumpsters stacked in pairs on a grassy lot surrounded by pine trees.

This guide was built from City of St. Augustine Beach Building Department pages and forms retrieved on November 10, 2026, St. Johns County’s construction and demolition debris page, and FDEP, EPA, and Sunshine 811 pages. Confirm the current forms with the City before filing.

St. Augustine Beach is not St. Augustine

The City of St. Augustine Beach and the City of St. Augustine are separate cities with separate permit offices, and addresses in unincorporated St. Johns County are handled by the County. The historic-review and archaeology rules that apply in the City of St. Augustine are not the same process here. Check which government has jurisdiction over the parcel before you prepare anything.

How to submit: email, labeled PDFs, and the Fire Marshal

The City’s Building Department page gives these instructions:

  • Email applications and plans to [email protected]. Break the submittal into separate PDF attachments named for what they are, such as “Site Plan.” If the package is over 25 MB, send it in multiple emails.
  • Do not upload attachments through the Construction Permit Self Service (CPSS) portal; the City says uploads there are not treated as submitted and staff are not alerted.
  • For hard-copy submittals that go to the St. Johns County Fire Marshal’s Office, include the City’s Building Permit/Clearance Sheet Application with the plan set. For digital submittals, send the package to the City address and the City documents it and forwards it to the Fire Marshal.
  • Right-of-way permits are handled directly with the City’s Public Works division.
  • Inspections can be requested through CPSS, by calling (904) 471-8758, or by email.

Those phone numbers and email addresses are City contacts, not Dependable Demolition contacts.

What the demolition application asks for

The City’s Demolition Permit Application (form 20-01) asks for the parcel ID and legal description, the estimated completion date, owner and contractor details, the fee simple titleholder, the bonding company if any, the prior use of the building (residential, business, school, or other), and the building’s total square footage, height, and number of floors. Both the owner (or agent) and the contractor sign before a notary.

The application also states that separate permits must be secured for building, electrical, mechanical, plumbing, signs, wells, pools, septic systems, and similar work, carries the standard Notice of Commencement warning, and says the permit becomes void if work does not start within 180 days or is suspended or abandoned for 180 days.

Asbestos language on the City form

The form summarizes the federal Asbestos NESHAP notice rule: owners or operators, including contractors, demolishing institutional, commercial, public, or industrial buildings must give written notice to FDEP’s Northeast District at least 10 working days ahead, with an exclusion for residential buildings of four or fewer dwelling units that remain residential. FDEP’s own Asbestos Program page currently lists the Northeast District main number as 904-256-1700, accepts notices through the DEP Business Portal, and charges $100 when filed and paid online or $200 otherwise.

The form also includes an owner-builder asbestos disclosure describing a narrow state exemption for owners of an owner-occupied residence. That disclosure is legal information, not a recommendation; asbestos-suspect materials are best surveyed and handled by licensed professionals.

Haulers must hold a City franchise

According to the Building Department page, all businesses conducting private collection and disposal of commercial, construction, and demolition debris within St. Augustine Beach City limits may do so only by franchise agreement and application. The City’s franchise application page says haulers return the application and agreement to City Hall with a $300 franchise fee. Before booking a roll-off for a demolition, ask the hauler whether it holds a current St. Augustine Beach franchise.

Where the debris ends up is a separate question. St. Johns County’s construction and demolition debris page says County residents and businesses are required to take C&D debris to the St. Marks C&D Disposal Facility, 1000 St. Marks Pond Blvd., or the Waste Pro Transfer Station, 3705 Deerpark Blvd., Elkton. Ask your hauler which facility will receive the load and whether concrete or metal will be separated for recycling.

Trees and wetlands

Removing trees on private property in the City requires a permit. The City’s Tree Removal Permit Application says an inspection of the trees to be removed is done before the permit is issued, asks for the number and type of trees, the estimated cost and completion time, and the plans for disposal, and references the City’s Land Development Regulations sections 5.01.00 through 5.01.08. A separate application is listed on the City’s Forms & Applications page for trees 30 inches or greater in diameter at breast height.

The tree application also includes a wetlands certification: the applicant acknowledges that construction in wetlands is severely restricted, needs prior approval from the regional or federal agency with jurisdiction, and that no City permit can authorize wetlands use. If a lot has marshy or saturated areas, raise that before demolition planning goes further.

Lead and locates

EPA’s lead and demolition guidance says the Renovation, Repair, and Painting Rule applies to renovation and partial demolition of pre-1978 residential buildings, not total demolition, and recommends lead-safe practices in both cases. Before slab, footing, or pool removal, Sunshine 811 asks for at least two full business days’ notice.

What this page does not claim

This page summarizes public City and County requirements and is not legal advice or a quote. Dependable Demolition does not list an office in St. Augustine Beach, does not represent that it holds a City solid waste franchise, and does not file applications because you inquired. The company’s October 2026 North Florida cost guide includes St. Johns County in its primary service footprint; whether a given address can be served is confirmed after an inquiry. Company background is on the About page.

To ask about a St. Augustine Beach demolition, call (855) 713-6280 or email [email protected] with the address and a short description of the structures and any trees involved. That is an inquiry, not a price, a booking, or a permit filing.

What demolition costs around St. Augustine Beach

On a St. Augustine Beach lot, the building often comes out with a slab, walk, or driveway, and flood or coastal setbacks can affect how the work is staged. The averages below cover a residential teardown and concrete removal, plus a 20-yard roll-off commonly used for that mix of debris.

WorkAverage published range
Full house demolition$4-$12 per sq ft, or about $6,500-$22,950 for a typical job
Concrete driveway or slab removal$2-$7 per sq ft, or about $1,250-$3,150 for a typical driveway
20-yard roll-off dumpster in Northeast Florida$505 average ($449-$550 posted)

These figures are averages compiled from other online sellers and cost guides, not a Dependable Demolition quote. Sources: HomeGuide, Redfin, Angi, HomeGuide, Angi, Fixr, HomeAdvisor, American Rolloffs, VETCANS, 904 Dumpster, and Double D’s Dumpsters.

Dependable gives a firm quote after seeing the site in St. Augustine Beach. Call (855) 713-6280 or email [email protected].

Frequently asked questions

How do I submit a demolition permit in St. Augustine Beach?

By email to [email protected], with each document as a separately labeled PDF. The City says not to upload attachments through its CPSS portal, because those uploads are not treated as submitted.

Does the demolition application need to be notarized?

Yes. The City’s form has notarized signature blocks for both the owner or owner’s agent and the contractor.

Does the St. Johns County Fire Marshal review St. Augustine Beach permits?

Some submittals go to the County Fire Marshal’s Office. For digital submittals, the City says it documents the package and forwards it to the Fire Marshal for you; hard-copy sets need the City’s Building Permit/Clearance Sheet Application.

Can any dumpster company haul my demolition debris in St. Augustine Beach?

The City says private collection of construction and demolition debris inside City limits is allowed only under a City franchise agreement. Ask your hauler whether it holds a current franchise.

Where does C&D debris go in St. Johns County?

St. Johns County’s page says residents and businesses must use the St. Marks C&D Disposal Facility in St. Augustine or the Waste Pro Transfer Station in Elkton. Confirm with your hauler which one receives the load.

Do I need a permit to remove trees before demolition?

Yes, for trees on private property in the City. The tree removal application says the trees are inspected before a permit is issued, and trees 30 inches or larger in diameter have a separate application.

When does a demolition permit expire in St. Augustine Beach?

The application says it becomes void if work does not start within 180 days, or if work is suspended or abandoned for 180 days.

How do I ask Dependable Demolition about a St. Augustine Beach project?

Call (855) 713-6280 or email [email protected] with the address and scope. The ranges on this page are averages from other online sellers, not a Dependable quote. Dependable gives a firm quote after seeing the site.

Posted on November 16, 2026 in