Camden County, GA Demolition Permits: Kingsland, St. Marys, Woodbine, and Unincorporated Rules

Short answer: in Camden County, Georgia, the office that permits a demolition depends on the address. Camden County Planning & Development handles only unincorporated land, and the County states plainly that it issues no permits or licenses for the cities of Kingsland, St. Marys, or Woodbine. Georgia EPD wants a demolition notice 10 business days before work starts, whether or not asbestos is present. Debris from a teardown goes to the County’s own C&D landfill on Georgia Highway 110, which posts a gate rate of $20 per ton in county.

Black straight-wall roll-off dumpsters stacked in pairs on a grassy lot surrounded by pine trees.

This guide draws on official pages from Camden County, the cities of Kingsland, St. Marys, and Woodbine, the Georgia Environmental Protection Division, the Georgia Department of Natural Resources, and the Georgia Coastal Health District, all checked on November 17, 2026. Rules and fees change, so confirm with the office named before you file. Phone numbers for public offices below are government contacts, not Dependable Demolition numbers.

Which office issues the permit for this address?

The County’s About Camden County page lists three incorporated cities, Kingsland, St. Marys, and Woodbine, and names Waverly, Tarboro, White Oak, Colesburg, Dover Bluff, and Harrietts Bluff as unincorporated communities. The County’s Planning & Development public portal says it issues permits and licenses for the unincorporated area only. A mailing address is a poor guide. The County’s own solid waste FAQ notes that the landfill sites carry Folkston addresses but sit in unincorporated southwest Camden, and that the Old Still Road yard waste site has a Woodbine address but is in the greater Kingsland area. Confirm the parcel’s jurisdiction with the office before you file.

Where the parcel isPermit officeWhere to start (government contacts)
Unincorporated Camden CountyCamden County Planning & Development, 135 Gross Road, KingslandForms & Applications page; (912) 729-5603; Monday through Friday, 8 a.m. to 5 p.m.
City of KingslandKingsland Housing & Development Department (Building Official and building inspection)City Housing & Development page; Building Inspector (912) 729-8296
City of St. MarysSt. Marys Building Department, City Hall, 418 Osborne St.City Building Department page; City Hall (912) 510-4000; applications through Cloudpermit
City of WoodbineWoodbine Building Permits and Code Enforcement, 310 Bedell AvenueCity permits page; (912) 576-3211

Unincorporated Camden County: the County demolition permit

The County’s Forms & Applications page says demolition permits can be applied for through its online portal, and it also posts a Demolition Permit application (PDF). That form is more specific than most. It asks you to check what is coming down (house, manufactured home, shed, barn, or other), and then asks for the applicant, the property owner, the site address, the cost, the map and parcel number, zoning, and lot size. Most useful for planning, it asks whether the electric, gas, and water have been disconnected, and for electric it names two possible power companies, OREMC and Georgia Power. It also asks for the contractor’s name and local business license number.

The form’s second page is an acknowledgement that issuing the permit does not give you permission to demolish before any required Georgia EPD asbestos notice has been filed, and it says an on-site inspection will be conducted by a member of the Camden County Assessors Office for all permits issued.

How review works

  • The portal asks you to allow up to 7 business days for an e-mail about the status of a completed application. All permits are reviewed before payment is accepted and the permit is issued.
  • The portal says permits are not valid unless a Georgia business license is current and all fees have been paid.
  • Inspections must be requested at least 24 hours ahead. Daily inspections are generally performed between 9 a.m. and 4 p.m.
  • Impact fees, which matter if you plan to rebuild, are paid separately from permit fees.

On cost, the County’s Permit Fee Schedule lists new single-family construction, mobile homes, accessory structures, trades, and a $100 re-inspection fee, but no demolition line. Do not assume a number. Ask Planning & Development what the demolition permit costs when you submit. The County also says that starting January 1, 2026 it uses the newly adopted state building codes, including the 2024 International Residential Code and 2024 International Building Code with Georgia amendments (see its Building Codes page), which matters for whatever you build after the teardown.

Inside Kingsland, St. Marys, and Woodbine

Kingsland. The City’s Housing & Development Department is home to the Building Official and building inspection, and its page lists Building Inspector James George at (912) 729-8296. The page we reached did not publish a demolition-specific checklist or fee, so call before filing and ask what the City wants for a demolition.

St. Marys. The City’s Building FAQs state that a permit is required for demolition, among other work, and the City’s Building page says all building requests and inspections go through Cloudpermit, with inspections requested by 2 p.m. the day before. The City’s building permit packet lists a demolition permit fee of $100 regardless of structure size or materials; the packet is undated, so confirm that it is still current. The most unusual St. Marys rule is historic. According to the City’s Community Development FAQ, a property inside the Historic District needs a Certificate of Appropriateness for alterations that affect its exterior, and the examples include demolition or relocation of an existing building and removal of healthy trees measuring 10 or more inches in diameter. The Historic Preservation Commission reviews those applications and meets on the fourth Tuesday of each month, so a historic-district teardown can add weeks before the building permit even matters.

Woodbine. The City’s Building Permits and Code Enforcement page links a building permit application, and the application form (PDF) asks for the contractor’s state license number, the owner’s information, the electric company (Georgia Power or REA), and, in the city-use section, whether the property is in a flood zone and the base flood elevation. We could not confirm a demolition fee from an official Woodbine page, so ask City Hall for the current amount.

The Georgia EPD asbestos notice

Georgia EPD’s Asbestos Licensing and Notifications page says a project notification must be submitted through the Georgia EPD Online System (GEOS) 10 business days before any demolition, renovation, or asbestos abatement activity, and that EPD accepts notifications only through GEOS. EPD’s notification requirements memo adds that the federal standard requires notification for regulated demolition projects whether or not asbestos is present, that regulated asbestos has to be removed before demolition, and that the building must be inspected first. The same memo, last revised in May 2018, says legal owners of residences with four or fewer dwelling units are exempt from the demolition notification unless the job is part of a larger project, such as a road project or commercial development. Because the County’s form tells every applicant to file any notice that is required, do not rely on the exemption on your own: call EPD’s asbestos duty officer at (404) 363-7026 and ask.

Utilities, septic tanks, and Georgia 811

Close or cap every utility before the building comes down. The County’s form asks about electric, gas, and water, and names OREMC and Georgia Power as electric choices, so go by the name on the bill. Georgia 811 says it connects utilities with excavators and homeowners planning mechanized digging activity, and it lists demolition among those activities, so call 811 before heavy equipment touches the ground.

Where there is no public sewer, a teardown usually includes a septic tank. The Georgia Coastal Health District says its Environmental Health program permits and inspects on-site sewage systems. The Camden County Health Department’s Environmental Health office is at 101 Winding Road in Kingsland, (912) 729-6012, per the District’s Camden County Health Department page. Ask what they want before the tank is pumped, crushed, or removed.

Where Camden County demolition debris goes

The County’s Construction & Demolition Industrial Waste Landfill page says the C&D landfill has operated since 2003 and takes EPD-approved construction and demolition debris, pre-qualified industrial waste, and land clearing debris that meets size rules. Logs over 6 inches in diameter must be cut into 4-foot lengths, branches over 4 inches into 8-foot lengths, and stumps must have 1 foot or less of trunk attached. The site is at 1600 Georgia Highway 110 near Folkston, in extreme southwest Camden County, open Monday through Friday from 7 a.m. to 5 p.m. and Saturday from 7 a.m. to noon; the main number is (912) 576-9374. The County requires tarps and straps and says a load without them will not be allowed to dispose.

What the County charges

The County’s Tipping Fees page lists these published gate rates:

  • C&D, in County: $20.00 per ton.
  • C&D, out of County: $27.50 per ton.
  • C&D, industrial: $30.00 per ton.
  • Asbestos: $30.00 per cubic yard.
  • Special waste: $52.50 per ton, and special waste must be pre-approved (call (912) 510-5854).

For example, a 10-ton load of clean demolition debris would be about $200 at the in-county rate or $275 at the out-of-county rate, before any contractor or hauling charge. That arithmetic is only an illustration; the County says negotiated rates may apply to long-term customers, and the fees are adjusted each July 1 using a consumer price index. Card payments carry a 3 percent processing fee with a $2 minimum. Liquids, lead acid batteries, petroleum products, pesticides, herbicides, and untreated non-residential biomedical waste are not accepted (see the County’s Solid Waste page and solid waste FAQ). Call the Solid Waste Department before planning any asbestos-containing load.

What the County does not do

The Solid Waste Department says it does not provide transportation for waste. Under the County’s Curbside Collection page, unincorporated Camden has mandatory curbside service through contractor Meridian Waste, with one 95-gallon cart per household, and residents inside Kingsland, St. Marys, or Woodbine get curbside service through their city, not the County. A cart is not a way to move teardown debris. The Old Still Road yard waste site is open Saturdays from 7 a.m. to 11 a.m. for residential yard waste only, with no commercial customers. Furniture goes to the County’s separate municipal solid waste landfill at 2750 Georgia Highway 110.

Flood zones, marsh edges, and historic districts

Camden is low, tidal, and hurricane-exposed, and the County says so on its Flood Protection page: the county floods from surrounding rivers and from hurricane storm surge. The page says unincorporated Camden holds a Community Rating System rating of 6, which gives residents a 20 percent flood insurance premium discount, and it points owners to the Planning & Development Department for the Base Flood Elevation and for a Flood Zone Determination letter. The County’s portal also accepts elevation certificates as uploaded documents. If you plan to rebuild after a teardown, ask for the flood zone before you design anything, and look at the County’s FEMA permitting guidelines (PDF), which lists what may or may not be allowed below the base flood level in Zone AE; it says, for example, that bathrooms, heating and air conditioning equipment, and hot water tanks are not permitted below that level.

Near salt marsh or a beach, the state has a say as well. The Georgia DNR Coastal Resources Division’s Marsh & Shore Permits page says that if you are planning any construction or activity in or near salt marsh, you must contact its office for a jurisdictional determination and to find out whether a Coastal Marshlands Protection Act permit is needed. A demolition on an upland lot is a different matter from work in the marsh, but if the lot touches a marsh edge, a dock, or a bank, make that call before equipment or fill goes in.

Questions to settle before you file

  • Is the parcel in unincorporated Camden or inside Kingsland, St. Marys, or Woodbine?
  • If it is in St. Marys, is it inside the Historic District, and does it need a Certificate of Appropriateness first?
  • Have the electric, gas, and water been disconnected, and who is the electric provider?
  • Has the asbestos inspection been done, and has the GEOS notice been filed 10 business days ahead?
  • Is there a septic tank, and has the Environmental Health office been called?
  • Where will the debris go, and is the load tarped and strapped for the Highway 110 scale?
  • Is any part of the lot in a flood zone or near marsh?

What demolition costs

Landfill gate fees are posted above, but contractor pricing depends on access, structure type, hazardous materials, and what is under the slab. The ranges below are national averages from other online sellers and cost guides, not Dependable quotes, and none is specific to Georgia.

WorkAverage published range
Full house demolition$4-$12 per sq ft, or about $6,500-$22,950 for a typical job
Single-wide mobile home demolition$2,650-$5,000
Shed removal (structure only)$335-$2,500
Concrete or slab removal$2-$7 per sq ft

These figures are averages compiled from other online sellers and cost guides on November 16, 2026, not a Dependable Demolition quote. Sources: HomeGuide, Redfin, Angi, Angi (residential structures), Bees Mobile Home Removal, HomeGuide (sheds), Angi (sheds), SmoothQuotes, HomeGuide (concrete), Angi (concrete), and Fixr.

For local-area context, our North Florida demolition cost guide covers five Northeast Florida counties. You can also read more about Dependable Demolition.

Asking Dependable Demolition about a Camden County project

Call (855) 713-6280 or email [email protected] with the project address. Include what is coming down, whether the address is in unincorporated Camden or a city, and anything you already know about utilities, asbestos, or septic. Camden County is not one of the counties named in our cost guide, so whether we can take the job is confirmed after we review the address. An inquiry does not reserve a date or start a permit. Pricing is quote-only.

Frequently asked questions

Who issues a demolition permit in Camden County, GA?

It depends on where the parcel sits. Camden County Planning & Development issues demolition permits only for unincorporated Camden County. Inside Kingsland, St. Marys, or Woodbine, the city’s own building office issues the permit, and the County says it issues no permits or licenses for those three cities.

What does Camden County’s demolition permit application ask for?

The County’s one-page form asks what is coming down (house, manufactured home, shed, barn, or other), the site address, parcel number, zoning, lot size, and cost, and whether the electric, gas, and water are disconnected. It also asks for the contractor’s name and local business license number. A second page acknowledges the Georgia EPD asbestos notice.

How much is a demolition permit in Camden County?

The County’s posted Permit Fee Schedule does not list a demolition fee, so confirm the amount with Planning & Development at (912) 729-5603 before you apply. In St. Marys, the City’s building packet lists a $100 demolition permit fee regardless of structure size or materials.

Do I have to notify Georgia EPD before a demolition in Camden County?

Georgia EPD says a project notification must be submitted through its GEOS online system 10 business days before any demolition, renovation, or asbestos abatement. The County’s own permit paperwork says the permit does not let you start before any required notice is filed. Call EPD’s asbestos duty officer at (404) 363-7026 if you are unsure whether your building is covered.

Where does demolition debris from Camden County go?

The County runs a construction and demolition landfill at 1600 GA Highway 110 near Folkston, in unincorporated southwest Camden County. It is open Monday through Friday from 7 a.m. to 5 p.m. and Saturday from 7 a.m. to noon, requires tarps and straps, and posts C&D tipping fees of $20 per ton in county and $27.50 per ton out of county.

Does Camden County pick up demolition debris?

No. The County’s Solid Waste Department says it does not provide transportation for waste. Curbside carts in unincorporated Camden are for household trash, and the Old Still Road yard waste site is Saturday-only, for residents, with no commercial customers.

Who handles septic tank removal in Camden County?

The Camden County Health Department’s Environmental Health office at 101 Winding Road in Kingsland, (912) 729-6012, permits and inspects on-site sewage systems. Call before the tank is pumped, crushed, or removed so you know what paperwork and inspection they want.

How do I ask Dependable Demolition about a Camden County project?

Call (855) 713-6280 or email [email protected] with the project address. Camden County is not one of the counties named in our cost guide, so whether we can take the job is confirmed after we review the address. Pricing is quote-only.

Related guides: Camden County sits on the Georgia side of the state line just north of Nassau County, Florida. If your project is near the line, see our Nassau County demolition guide and our Fernandina Beach historic district demolition guide. Next door to Nassau, our Duval County guide covers Jacksonville, the beaches, and Baldwin, and our Baker County guide covers Macclenny and its neighbors west of Jacksonville.

Follow Dependable Demolition: see recent jobs and equipment on our Facebook Page and company updates on our LinkedIn Page.

Posted on November 17, 2026 in